Interior Design BOQ: What Should It Include?

Interior Design BOQ: What Should It Include? | Dwarka

Interior Planning · BOQ Guide

Interior Design BOQ: What Should It Include?

A good interior design BOQ turns a broad quotation into a clear project scope. It should show what is being made, where it is being used, how much is required, which materials and specifications apply, and what is included or excluded.

The short answer

An interior BOQ should normally cover the work item, location, dimensions or quantity, board or construction material, thickness, finish, hardware, accessories, rate, amount, installation responsibility and relevant exclusions. The exact format can vary by project, but important specifications should not be left vague.

Modern home interior with detailed cabinetry and furniture
Scope Rooms + work items
Quantity Dimensions + units
Specification Materials + hardware
Commercials Rates + exclusions

Why the BOQ matters

A BOQ is more than a price sheet.

In an interior project, the final amount depends on much more than the number printed at the bottom of a quotation. Kitchen size, wardrobe configuration, board specification, finish, hardware, furniture, electrical work, installation and site requirements can all change the actual scope.

A properly prepared BOQ documents those details so the homeowner, designer, contractor and execution team are working from the same project definition.

01 · BOQ basics

What information belongs in an interior BOQ?

01

Work item

Clearly identify the item being supplied or executed: kitchen cabinets, wardrobe, TV unit, bed, false ceiling, lighting, painting or another agreed element.

02

Location

Mention the room or zone so the quantity and specification can be understood in context.

03

Measurement

Record dimensions, area, running length, number of pieces or another suitable unit of measurement.

04

Material

Identify the board, surface, stone, glass, metal, paint or other primary material required for the item.

05

Specification

Where relevant, record grade, thickness, finish, brand or agreed equivalent, construction method and application.

06

Commercial value

The BOQ should connect the agreed quantity and specification with the rate, amount and applicable commercial terms.

02 · Project scope

Start with everything the project is actually supposed to cover.

A BOQ becomes difficult to compare when one quotation includes a room or trade that another quotation leaves outside the package.

Modular kitchen Cabinets, shutters, internal storage, hardware and accessories.
Wardrobes Carcass, shutters, shelves, drawers, lofts and fittings.
Living room TV unit, storage, furniture, wall treatments and lighting where specified.
Bedrooms Beds, wardrobes, study units, side tables and selected furniture.
Ceiling + lighting False ceiling, profiles, fixtures and electrical scope where included.
Finishes Paint, laminate, veneer, acrylic, glass, wallpaper or other approved finishes.
Civil work Demolition, partitions, flooring or other work only where specifically included.
Installation Fabrication, transportation, site installation, finishing and handover responsibilities.

03 · Materials & construction

“Plywood” or “laminate” alone is not a complete specification.

Material names can hide significant differences. The BOQ should describe the construction specification appropriate to the application rather than relying on a generic material label.

ElementWhat to specifyWhy it matters
BoardBoard type/grade, application and thicknessThe substrate affects construction, durability and cost.
FinishLaminate, acrylic, veneer, PU, paint or other approved finishAppearance, maintenance and cost can vary significantly.
EdgesEdge banding, sealing or other applicable treatmentEdges are part of the finished construction, particularly in moisture-prone areas.
CountertopMaterial, thickness, profile and relevant cut-outsStone and countertop scope can materially affect kitchen pricing.
Glass / metalType, thickness, finish and applicationDifferent specifications can look similar but have different costs.
PaintSystem, finish and number of coats where applicableSurface preparation and finish quality affect the final result.
Modern kitchen cabinetry and countertop
Contemporary bedroom wardrobe and interior
Living room furniture and interior finishes

04 · Quantities & measurements

A BOQ should explain how the quantity was arrived at.

A number without a unit or measurable basis is difficult to verify. Depending on the item, the BOQ may use running feet, square feet, square metres, pieces, sets, points or another suitable unit.

WorkPossible unitUseful detail
WardrobeRunning ft / sq ft / unitWidth, height, depth, shutters and internal configuration.
Kitchen cabinetsRunning ft / modulesBase units, wall units, tall units and accessories.
False ceilingSq ftArea, design zones and included lighting/profiles.
LightingPieces / pointsFixture type, wattage/specification and electrical responsibility.
FurniturePieces / setsDimensions, construction, upholstery and finish.
PaintingSq ft / room / packageSurface preparation, paint system and included coats where relevant.

05 · Hardware & accessories

Hardware is part of the construction specification.

Cabinet performance depends not only on the board and finish but also on the hinges, drawer systems, channels, handles, baskets and other functional fittings. Important hardware should therefore be identifiable in the BOQ.

Hinges

Specify the hinge type and relevant soft-close or functional requirements.

Drawer systems

Identify the drawer mechanism and any load or soft-close specification.

Channels

Record the relevant channel or runner specification rather than leaving it as a generic “hardware” allowance.

Kitchen accessories

Baskets, bottle pull-outs, corner mechanisms, lift systems and other accessories should be separately identifiable.

Handles

Specify profile, handle type, finish or agreed equivalent where important to the design.

Other fittings

Include mirrors, glass fittings, wardrobe accessories or other functional components where they form part of the approved scope.

06 · Room-by-room BOQ

Break the project into understandable zones.

ZoneTypical BOQ itemsSpecification to clarify
KitchenBase cabinets, wall cabinets, tall units, countertop, accessoriesBoard, finish, hardware, dimensions, countertop and installation.
Master bedroomWardrobe, bed, side tables, dresser, TV/storageDimensions, construction, finish, hardware and furniture scope.
Bedroom 2 / 3Wardrobe, bed, study unit, storageRoom-specific quantities and approved design.
Living roomTV unit, storage, furniture, wall treatmentFurniture, panels, finish, lighting and electrical scope.
DiningDining furniture, crockery/storage units, lightingFurniture dimensions and fixture responsibility.
Common areasEntry storage, shoe unit, ceiling, lighting, paintingDimensions, quantity and installation responsibility.

07 · Exclusions & responsibilities

What is not included can be just as important as what is included.

A clear BOQ should identify exclusions rather than leaving them open to interpretation. The exact exclusions depend on the project and contract.

Appliances Refrigerators, ovens, washing machines and other appliances may sit outside the interior package unless specifically included.
Loose furniture Sofas, chairs, mattresses, rugs and decor may be separate unless listed.
Major civil work Structural changes, extensive demolition or major masonry work should be explicitly defined.
Plumbing changes Relocation, concealed work or additional plumbing should be identified where relevant.
Electrical changes New circuits, DB work, relocation and fixture supply should have clear scope.
Site restrictions Building permissions, working-hour restrictions, access and material handling can affect execution responsibility.

08 · Homeowner checklist

Before approving the BOQ, check these points.

Every room is listed Confirm that the approved design scope matches the BOQ.
Quantities are measurable Check dimensions, units, pieces and areas.
Board specifications are clear Confirm type, grade, thickness and application where relevant.
Finishes are identified Laminate, acrylic, veneer, paint, glass or other approved finishes should be clear.
Hardware is not generic Important hinges, runners, channels and accessories should be identified.
Installation is defined Confirm fabrication, transport, installation and site handling responsibilities.
Taxes are clear Confirm whether applicable taxes are included in the quoted amount.
Exclusions are written Do not rely on verbal assumptions for excluded work.
Changes have a process Confirm how additions, deletions and material substitutions are approved.
Warranty is documented Check what is covered, for how long and under whose responsibility.

09 · Common BOQ mistakes

Where homeowners often lose clarity.

Comparing only the final price Two quotations can have different quantities, specifications and exclusions.
Writing only “plywood” The BOQ should identify the relevant board specification and application.
Generic hardware allowance Important hardware should be identifiable rather than hidden in one broad line.
No room-level breakdown A single lump-sum line makes it harder to understand what is actually covered.
Undefined exclusions Unclear exclusions can create additional-cost discussions later.
Unapproved substitutions Material or hardware substitutions should follow an agreed approval process.

10 · BOQ vs quotation

They work together, but they are not exactly the same thing.

BOQQuotation
Breaks the project into measurable work items.Presents the commercial price for the agreed project scope.
Records quantities and specifications.Shows rates, amounts, taxes and commercial conditions.
Helps define what will actually be executed.Helps define the financial agreement.
Useful for procurement and execution control.Useful for commercial approval and payment milestones.

In a well-defined project, the quotation and BOQ should support each other rather than describe conflicting scopes.

11 · From BOQ to execution

A useful BOQ should remain connected to the actual design.

01

Brief

Establish rooms, lifestyle requirements, storage needs, priorities and budget direction.

02

Measurement

Verify dimensions, openings, services, site conditions and access.

03

Design

Develop layouts, furniture, elevations, materials and key details.

04

Specification

Finalize boards, finishes, hardware, fixtures and other approved selections.

05

BOQ

Convert the approved scope into measurable items, specifications and costs.

06

Execution

Manufacture, install, inspect, resolve snags and hand over according to the approved scope.

13 · Frequently asked questions

Interior design BOQ questions.

What is a BOQ in interior design?

BOQ means Bill of Quantities. In an interior project, it is a detailed document that records the agreed scope, quantities, measurements, materials, specifications, rates and project costs.

What should an interior design BOQ include?

A useful BOQ should identify the work item, location, dimensions or quantity, material and construction specification, finish, hardware where applicable, rate, amount and relevant installation or execution responsibility.

Should plywood thickness be mentioned in the BOQ?

Yes. Where board products are used, the BOQ should identify the board type or grade, thickness, intended application and agreed brand or equivalent specification where relevant.

Should hardware be included in an interior BOQ?

Yes. Hinges, drawer runners, channels, baskets, lift systems, handles and other important fittings should be identified so the scope is not based only on the cabinet or furniture body.

Should installation be included in the BOQ?

The BOQ should clearly state whether fabrication, transportation, installation, site handling and finishing are included or excluded.

Why is a BOQ important when comparing interior quotations?

A BOQ allows homeowners to compare quotations on the same scope, quantities and specifications instead of comparing only the headline project price.

Can the BOQ change during an interior project?

Yes. Approved changes, additional work, site conditions or client selections can change the BOQ. Changes should be documented and approved before execution wherever possible.

What exclusions should be mentioned in an interior BOQ?

Exclusions may include appliances, loose furniture, major civil or structural work, plumbing relocation, electrical upgrades, curtains, air-conditioning or other items outside the agreed scope. The exact exclusions should be project-specific.

Plan with clarity

Start with a measured scope, then build the BOQ.

For a Dwarka home interior project, the useful starting information is the property type, approximate area, floor plan, rooms required, storage needs, kitchen requirements, preferred style and project priorities.